about
OpenHAB Info
OpenHAB FAQ
new
flight simulator
blog
en
My Learjet 45 Home Cockpit
My Flight Simulator home cockpit building steps
My Learjet 45 Home Cockpit (63 posts)
13/09/2023
Landing at Alghero Fertilia LIEA, Online on IVAO
30/06/2023
MOBIFLIGHT - Input interface buttons
01/06/2023
External views
23/05/2023
AIR MANAGER panels editing - Cold and Dark
12/05/2023
CUSTOM instrument panels
29/04/2023
LOGITECH (ex SAITEK) commercial instruments
28/03/2023
Version 2 Simulator Structure
19/03/2023
Managing HOME COCKPIT buttons with MOBIFLIGHT and ARDUINO
16/03/2023
GLASS COCKPIT with AIR MANAGER
12/03/2023
Testing AIR MANAGER with a network PC
27/02/2023
POV - Startup, Taxi and Takeoff
02/10/2022
Assembled Startup Panel Led
09/09/2022
Center Pedestal Lights
04/09/2022
Let's start again with Version 2
27/12/2015
Flying with Falchi di Daffi
05/01/2015
Testing Front Panel v 2
04/01/2015
Front Panel v 2 is ready to be completed
02/01/2015
It's up to us - new plastics for new lights system
07/06/2014
My first real flight in "Cockpit View"
18/05/2014
Loano Air Show 2014
13/04/2014
Prepar3D v2.2 IS OUT
29/03/2014
Prepar3D v2.2 - Developer Blog
14/03/2014
Flying near window seat :)
12/03/2014
Air traffic in the Europe's sky
12/03/2014
Simulation of a real flight
02/03/2014
Prepar3D v2.1 HOTFIX 1
16/02/2014
The baggage's journey for a flight
15/02/2014
Missed Approach in Spain
15/02/2014
FSUIPC Update
12/02/2014
Prepar3D v2.1 Cleared for Landing - Update for Prepar3D 2
18/01/2014
Master Caution Warning and Main Power
30/11/2013
Prepar3d v 2.0
19/11/2013
Glass Cockpit
22/09/2013
Andora Air Show 2013
16/09/2013
Taxi lights installation on Learjet 45
15/09/2013
Little Summer Update - Lights
28/07/2013
Cloche holder
06/06/2013
Startup Panel - New Version
17/05/2013
Ivao Stress Test Event - Our test flight
10/05/2013
Glass Cockpit assembly
27/04/2013
Engine startup...
13/04/2013
Center pedestal completed
11/04/2013
Growing up...
01/04/2013
The Center Pedestal
28/03/2013
New panels...
28/03/2013
Led dimmer tests
21/03/2013
First completed panel - The Front Panel
17/03/2013
Wirings and leds...It's just the begin
23/02/2013
Wiring Test - MORSE CODE Panel
22/02/2013
First Wiring - MORSE CODE Panel
23/12/2012
The game gets seriuos
30/10/2012
Building the base
27/10/2012
Upper panel assembling
06/10/2012
Building...
25/08/2012
The definitive design...I hope!
20/08/2012
Buttons and leds test
30/06/2012
Test objects arrived
15/04/2012
Some design...
17/02/2012
"Handmade" input interface
03/02/2012
The SIOC
27/01/2012
First test with leds
16/01/2012
The project
14/01/2012
The Idea...
11/04/2013
Growing up...
by
Marco
Waiting for hardware to be used to wire the
center pedestal
, we fixed the
front panel
over the base...with the
center pedestal
till not connected.
Here is the result:
Back
Forward
This blog was migrated from Google blogger platform to my own website
Do you have a blog on Google blogger platform which you would like to migrate to your own website?
Send me an email